PTA – Bayswater Turnback Project
- Client: PTA
- Location: Bayswater
MGC Solutions was engaged by Coleman Rail to deliver these critical works as part of the ongoing Metronet program. Works delivered to the local inhouse team were:
- Long lead material assessment and procurement
- Off site manufacture of signalling frames and locations
- Factory acceptance testing
- Points machine installation
- Field testing and commissioning
- Civil installation and structural installation of wayside signalling infrastructure
- Cable installation, termination and testing
- Signalling, set to work, test and commission
- Signalling entry into service
- Optic fibre cable installation
- Optic fibre splicaing testing and cutover of critial services
![rail-1](https://www.mgcs.com.au/wp-content/uploads/elementor/thumbs/rail-1-qe9igrbbb992r2akcs07w4l6ch125hksfy08dyfo1c.jpg)
![specialised-1](https://www.mgcs.com.au/wp-content/uploads/elementor/thumbs/specialised-1-qe9igqdh4f7sfgbxi9llbmtpr35oxsh23tcqwoh27k.jpg)
![civil-1](https://www.mgcs.com.au/wp-content/uploads/elementor/thumbs/civil-1-qe9igs95i3ad2o977aeugmcmxuwfd6ois2npv8e9v4.jpg)