PTA – Bayswater Turnback Project

MGC Solutions was engaged by Coleman Rail to deliver these critical works as part of the ongoing Metronet program. Works delivered to the local inhouse team were:

  • Long lead material assessment and procurement
  • Off site manufacture of signalling frames and locations
  • Factory acceptance testing
  • Points machine installation
  • Field testing and commissioning
  • Civil installation and structural installation of wayside signalling infrastructure
  • Cable installation, termination and testing
  • Signalling, set to work, test and commission
  • Signalling entry into service
  • Optic fibre cable installation
  • Optic fibre splicing testing and cutover of critical services